Bryan De Leon
Project Overview
Project Overview: To design a project and set a relistic timeline. My project was to model a relistic 3D model of a lion, add fur to the lion and stylize the fur and mane.
Software Tools: 3ds Max 2009, Macomedia Fireworks 8
Render Time: 6 minutes a frame
System Specs: 2.13Ghz Intel Core2 CPU, 1 GB RAM, 256MB ATI Radeon X1300PRO video card
Project Timeline:
Projected Goals for Each Week:
WEEK 1: 1/12 – 1/16
Get all or resources needed find tutorials
WEEK 2: 1/19 – 1/23
Model head
WEEK 3: 1/26 - 1/30
Continue Modeling head
WEEK 4: 2/2 – 2/6
Finish head and apply details
WEEK 5: 2/9 – 2/13
Model body
WEEK 6: 2/16 – 2/20
Finish body and attach head to body
WEEK 7: 2/23 – 2/27
Add fur. Detail model
WEEK 8: 3/2 – 3/6
Project web site, portfolio assembly
My thoughts on this project : I learned alot about modeling and that there are endless techniques and tricks used to model, Such as more advanced modeling using planes and box primitives. I was hoping to get a more detailed model when I first started but after starting this project I realized how complicated modeling really was, and to me the fur seemed really hard but after a couple of hours o learning how to stylize I got the hang of it, even though I didn't get the mane looking the way i wanted. This project took me about fourty hours of work witch was spread out over eight weeks, and I would have loved to put more time into the project if I had the chance. However I am satisfied with the skills I learned from this project and I am ready for the next.